Eligo is India's independent civic information platform for government schemes — not affiliated with any government body.

Eligo
ActiveCentral Sector SchemeLaunched December 2014Verified: 2026-10-12

Scheme for Development of Solar Parks & Ultra Mega Solar Projects

MNRE mega infrastructure scheme providing central grants up to ₹20 lakh per MW for setting up 40,000 MW capacity in solar parks.

Audited by Eligo Public Policy Research Desk•Official Gazette & Nodal Portal Verification•Read Verification Standards →
Share on WhatsApp
Official Nodal Portal:mnre.gov.in
Government Levelcentral Government
Administering BodyMinistry of New and Renewable Energy
Beneficiary Sector
Applicable Jurisdiction
All India

₹Benefits & Entitlement Breakdown

Central Financial Assistance (CFA) of up to ₹25 Lakh per solar park for Detailed Project Report (DPR) preparation and ₹20 Lakh per MW or 30% of project cost (whichever is lower) for internal infrastructure development (roads, water drainage, power evacuation, and fencing). Financial disbursements are credited via Direct Benefit Transfer (DBT) through the Public Financial Management System (PFMS) directly into verified Aadhaar-linked savings accounts. The scheme guarantees transparent delivery without intermediary commissions, providing institutional coverage, standardized administrative oversight, and official grievance redressal mechanisms for all verified beneficiaries.

📊Budget Allocation & Beneficiary Reach

Fiscal Budget Allocation

₹8,100 Crore Central Financial Assistance allocation for 40,000 MW target

Official Budget Document ↗
Verified Beneficiary Reach

50+ approved solar parks across 12 states with over 38,000 MW sanctioned

As of: 2025-12-31PIB / Official Citation ↗

Verified Eligibility Criteria

Age Requirement:No specific age restriction
Annual Family Income Ceiling:No gross income ceiling specified
Target Occupations:Solar Power Park Developer, State Nodal Agency, Renewable Energy CPSU
Eligible Gender:all
Social Category / Reservation:all
Specific Operational Conditions & Exclusions:

State Governments, CPSUs (such as SECI, NTPC), or private park developers forming a designated Solar Power Park Developer (SPPD) with minimum 500 MW planned capacity (or 20 MW for hilly/NE states).

📄

Required Documents Checklist

Verify readiness before applying for Scheme for Development of Solar Parks & Ultra Mega Solar Projects. Check off your papers or print this list before visiting your local CSC / Cyber Cafe.

Mandatory Documents(3)

Check off as ready
💡

Keep self-attested photocopies and clear digital scans (100 KB – 200 KB, PDF/JPG format) ready to avoid portal upload timeouts.

🛡️Civic Research Desk • Rejection Prevention

Worried About Application Rejection for Scheme for Development of Solar Parks & Ultra Mega Solar Projects?

Over 30% of applications on official portals get delayed or rejected due to minor certificate authority mismatches or unseeded bank accounts. Our civic research desk compiles a verified 1-page Scheme Blueprint tailored to your state and profile.

  • ✓Valid issuing authority rules (Tehsildar/SDM)
  • ✓Aadhaar-DBT bank seeding verification
  • ✓Direct official portal guide (no middlemen)
  • ✓Email delivery in 1–2 hrs during desk hours
Civic Research Fee:₹49One-time
Get Scheme Blueprint (₹49)→

🔒 Secure Razorpay Checkout • 100% Independent

Application Effort & Process Friction

Readiness assessment derived from official prerequisites, mandatory documentation, and submission channels.

Moderate Process (2/10)
•100% digital online application process
•3 mandatory supporting documents required

Effort scores reflect portal accessibility, mandatory document burden, and physical verification requirements.

How to Apply

🛡️
Government Application Safety Advisory:Application for this welfare program is processed exclusively on official government infrastructure (mnre.gov.in). Never pay registration charges or advance processing fees to unauthorized third-party agents. Central and State welfare scheme applications do not require paying private intermediaries.
  1. 1

    State Government or CPSU designates a Solar Power Park Developer (SPPD) as a Joint Venture or State agency.

  2. 2

    SPPD identifies encumbrance-free land and prepares comprehensive DPR.

  3. 3

    Proposal submitted to MNRE for approval under the Solar Park Scheme.

  4. 4

    MNRE sanctions CFA in milestone-linked installments (DPR preparation, land acquisition, civil works, power evacuation lines).

  5. 5

    Power developers are invited via transparent international competitive bidding to set up solar generation units inside the park.

✅Before You Begin — Pre-Application Checklist

✓Ensure Aadhaar is linked with active mobile number
✓Bank account is NPCI-mapped (Aadhaar-seeded) for DBT
✓Check if you already receive a similar Central scheme benefit
✓Keep documents ready: income/caste/domicile certificates as applicable

⚠️Common Rejection Reasons — Avoid These

Inability to secure contiguous encumbrance-free land, lack of grid connectivity transmission guarantees, or failure to establish designated SPPD.

Official Government Application Portal

You will be redirected to the secure official portal: mnre.gov.in

Apply on official government website
🔔Free Civic Notification Service•DPDP Act 2023 Compliant

Get Curated Scheme Alerts & Application Deadlines

Never miss an installment date, scholarship deadline, or new state subsidy. Voluntarily subscribe to receive verified government scheme updates directly on WhatsApp or Email.

+91
10-digit Indian mobile number
🛡️
Zero Data Sale Guarantee: Eligo does NOT sell, rent, trade, or transfer your personal contact information to any third-party broker, agency, or advertiser under any circumstances. Stored domestically in Mumbai, India.

🔒 Zero Spam • Stored securely in Mumbai, India

Verified Guidance

Expert Application Tips & Practical Advice

Field-tested recommendations from administrative grievance circulars to avoid rejections and processing stalls.

1
processTo apply for Scheme for Development of Solar Parks & Ultra Mega Solar Projects, initiate your application on the official portal at https://mnre.gov.in/solar/schemes. Verify procedure: State Government or CPSU designates a Solar Power Park Developer (SPPD) as a Joint Venture or State agency. Confirm all personal and bank details align with departmental records before final submission.
2
documentsFor Scheme for Development of Solar Parks & Ultra Mega Solar Projects, keep clear and legible scanned digital copies of mandatory documents (Detailed Project Report (DPR), Land Possession & Encumbrance Free Certificate, Grid Connectivity & Evacuation Feasibility Study) ready in PDF or JPEG format within prescribed portal size limits before starting your application on https://mnre.gov.in/solar/schemes.
3
common mistakesA frequent cause of rejection under Scheme for Development of Solar Parks & Ultra Mega Solar Projects is submitting mismatched personal details between Detailed Project Report (DPR) and your Aadhaar record, or providing an unseeded bank account. Verify active NPCI/DBT bank mapper linkage and valid certificate numbers on https://mnre.gov.in/solar/schemes.
4
trackingAfter successfully submitting your application for Scheme for Development of Solar Parks & Ultra Mega Solar Projects, securely save your permanent Application Reference Number (ARN) or digital acknowledgement receipt. Use this reference number on https://mnre.gov.in/solar/schemes to track scrutiny, verification, and sanction milestones.

Frequently Asked Questions (Officially Sourced)

Verified answers sourced directly from official circulars, gazettes, and portal FAQs. Never AI-invented.

What is the target capacity under the Solar Parks Scheme?

The scheme has an approved target of setting up 40,000 MW of solar power capacity across at least 50 solar parks in India.

Source: Official Scheme FAQ ↗

What is the financial grant provided for internal park infrastructure?

MNRE provides CFA of up to ₹20 Lakh per MW or 30% of project cost, whichever is lower, for internal power evacuation and civil works.

Source: Official Scheme FAQ ↗

Who manages the bidding of generation projects inside solar parks?

The Solar Energy Corporation of India (SECI), NTPC, or state designated agencies conduct competitive e-reverse auctions for power developers.

Source: Official Scheme FAQ ↗

Who is eligible to apply for Scheme for Development of Solar Parks & Ultra Mega Solar Projects?

Eligible applicants must satisfy official government criteria for Scheme for Development of Solar Parks & Ultra Mega Solar Projects. Conditions: State Governments, CPSUs (such as SECI, NTPC), or private park developers forming a designated Solar Power Park Developer (SPPD) with minimum 500 MW p.

Source: Official Scheme FAQ ↗

Can I track my Scheme for Development of Solar Parks & Ultra Mega Solar Projects application status?

Application status for Scheme for Development of Solar Parks & Ultra Mega Solar Projects can typically be tracked through the official portal at mnre.gov.in using your Aadhaar number, application reference number, or registered mobile number. Alternatively, contact the scheme helpline or visit your nearest Common Service Centre (CSC).

What should I do if my Scheme for Development of Solar Parks & Ultra Mega Solar Projects payment is delayed or rejected?

First, verify your Aadhaar-bank account seeding status on the NPCI mapper (npci.org.in). If seeding is confirmed and payment is still pending, register a complaint on the Central Public Grievance Redressal System at pgportal.gov.in. You may also file an RTI application at rtionline.gov.in to obtain official rejection reasons within 30 days.

Is there an income tax implication for receiving Scheme for Development of Solar Parks & Ultra Mega Solar Projects benefits?

Agricultural income and certain welfare subsidies may be exempt from income tax under Section 10 of the Income Tax Act, 1961. Tax treatment varies by scheme type and beneficiary income level. Consult a certified tax practitioner or visit incometax.gov.in for scheme-specific tax guidance.

Common Rejection Reasons & Warnings

Inability to secure contiguous encumbrance-free land, lack of grid connectivity transmission guarantees, or failure to establish designated SPPD.

Editorial Verification & Change Log

Scheme verification and change history
DateFieldDescription / UpdateSource Citation
2026-10-18scheme_typecsOfficial Source ↗
2026-09-18initial_verificationBaseline verification of Solar Parks Scheme 40 GW target, ₹20 Lakh/MW CFA guidelines, and SECI bidding frameworks.Official Source ↗

⚖Compare with Similar Schemes

Side-by-side eligibility, benefit, and effort comparison:

Application Window & Deadlines

Proposal submissions routed through State Governments and CPSUs

Scheme Intelligence

How is this calculated? ↗
Data ConfidenceFully Verified (100%)

Verified 7d ago from .gov.in source

Access FrictionModerate Process

Requires documentation or office visit

How to Apply🏢In-Person / Office
Scale & Impact
👥50+ approved solar parks across 12 states with over 38,000 MW sanctioned (as of 2025-12-31)
₹₹8,100 Crore Central Financial Assistance allocation for 40,000 MW target budget allocation
📅Running since 2014
🔄2 verified updates — actively maintained

Related Welfare Programs

PM Surya Ghar: Muft Bijli Yojana (Rooftop Solar)

Central renewable energy scheme providing central subsidies up to ₹78,000 for installing residential rooftop solar systems and delivering up to 300 units of free monthly electricity.

Paramparagat Krishi Vikas Yojana (PKVY)

Centrally sponsored organic farming scheme providing ₹50,000 per hectare assistance for organic inputs, PGS-India certification, and premium marketing.

MSME Sustainable (ZED) Certification Scheme

Central quality and competitiveness scheme providing up to 80% subsidies on Bronze, Silver, and Gold zero-defect zero-effect manufacturing certifications.

📅Scheme Milestone Timeline

2026-10-18scheme_type

cs

Official Source ↗
2026-09-18initial_verification

Baseline verification of Solar Parks Scheme 40 GW target, ₹20 Lakh/MW CFA guidel...

Official Source ↗
⚡

Schemes You Can Stack With This

Complementary programs with non-conflicting eligibility that you can claim concurrently:

Pradhan Mantri Kisan Samman Nidhi (PM-KISAN)₹6,000 (annual)✓ Open to all genders · Overlapping profile match
Pradhan Mantri Awas Yojana - Urban (PMAY-U / Housing for All)₹2,50,000 (one-time)✓ Open to all genders · Overlapping profile match
Pradhan Mantri Awas Yojana - Gramin (PMAY-G)₹1,20,000 (one-time)✓ Open to all genders · Overlapping profile match
Ayushman Bharat - Pradhan Mantri Jan Arogya Yojana (AB-PMJAY)₹5,00,000 (annual)✓ Open to all genders · Overlapping profile match

Official Helpline & Nodal Offices

Solar Energy Division, Ministry of New and Renewable Energy

Atal Akshaya Urja Bhawan, Pragati Vihar, Lodhi Road, New Delhi, Delhi 110003

Helpline: 011-20849125

Jurisdiction: National (All-India)

Notice a Discrepancy?

Help keep civic data 100% accurate. We audit every report against primary gazettes.

Verification Metadata

Last verified by Eligo researchers on 2026-10-12 against official government documentation.

Eligo is an independent information platform unaffiliated with any government body. Always confirm latest terms directly on the official portal.