PM-KUSUM Component A (Grid-Connected Solar Power Plants)

Enables individual farmers to set up 500 KW to 2 MW ground-mounted solar plants on barren land with guaranteed 25-year DISCOM power purchase.

✓एलिगो सार्वजनिक नीति अनुसंधान विभाग द्वारा सत्यापित • आधिकारिक गजट एवं नोडल पोर्टल सत्यापन2026-10-12
शासन स्तर (Level)केंद्रीय सरकार
प्रशासनिक निकाय (Ministry/Dept)Ministry of New and Renewable Energy
लाभार्थी क्षेत्र (Sector)
लागू कार्यक्षेत्र (Jurisdiction)
अखिल भारतीय (All India)

₹योजना के लाभ एवं पात्रता विवरण (Benefits Entitlement)

Enables individual farmers, cooperatives, and panchayats to establish 500 KW to 2 MW ground-mounted or stilt-mounted solar power plants on barren, fallow, or pasture land within 5 km of an electricity sub-station. Farmers earn steady rental income (₹25,000 to ₹50,000 per acre/year) by leasing land to developers or earn long-term revenue by selling solar electricity directly to DISCOMs under 25-year Power Purchase Agreements (PPAs) at pre-fixed feed-in tariffs.

📊बजट एवं लाभार्थी आंकड़े

वित्तीय बजट आवंटन

₹34,422 Crore central financial outlay for total PM-KUSUM scheme

आधिकारिक बजट दस्तावेज ↗
सत्यापित लाभार्थी संख्या

Commissioned over 1,200 MW solar capacity on farmer lands across India

दिनांक तक: 2026-01-31पीआईबी / आधिकारिक संदर्भ ↗

📋सत्यापित पात्रता मानदंड (Verified Eligibility Criteria)

आयु सीमा (Age Requirement):न्यूनतम 18 वर्ष
वार्षिक पारिवारिक आय सीमा (Income Ceiling):कोई आय सीमा निर्धारित नहीं
लक्षित व्यवसाय (Target Occupations):farmer, landowner, rural entrepreneur, panchayat leader
लिंग पात्रता (Eligible Gender):सभी नागरिक (पुरुष / महिला / अन्य)
सामाजिक श्रेणी / आरक्षण (Social Category):all
विशिष्ट परिचालन शर्तें एवं अपवाद (Specific Conditions):

Individual farmers, groups of farmers, cooperatives, panchayats, or Water User Associations owning land within 5 km radius of a 33/11 kV grid sub-station.

📄

आवश्यक दस्तावेज़ चेकलिस्ट (Document Checklist)

PM-KUSUM Component A (Grid-Connected Solar Power Plants) हेतु आवेदन पूर्व अपनी तैयारी जांचें। साइबर कैफे / सीएससी केंद्र जाने से पूर्व इसे प्रिंट या सेव करें।

अनिवार्य दस्तावेज़ (Mandatory)(4)

बॉक्स पर टिक करके जांचें
💡

प्रमाणपत्र स्व-सत्यापित (Self-attested) रखें तथा स्कैन प्रति 100 KB से 200 KB के बीच (PDF / JPG) में तैयार रखें ताकि ऑनलाइन पोर्टल पर अपलोड करने में त्रुटि न आए।

🛡️अस्वीकृति रोकथाम डेस्क • नागरिक मार्गदर्शन

PM-KUSUM Component A (Grid-Connected Solar Power Plants) में दस्तावेज़ या बैंक त्रुटि से आवेदन रद्द होने से बचाएं

सरकारी पोर्टलों पर लगभग 30% आवेदन बैंक सीडिंग (NPCI DBT) या अमान्य प्रमाण पत्र प्रारूप के कारण निरस्त या विलंबित हो जाते हैं। हमारा अनुसंधान डेस्क आपके राज्य व श्रेणी के अनुसार 1-पेज ब्लूप्रिंट तैयार करता है।

  • ✓तहसीलदार/एसडीएम सक्षम प्राधिकारी नियम
  • ✓आधार-डीबीटी बैंक खाता सीडिंग जांच
  • ✓आधिकारिक पोर्टल लिंक (शून्य दलाली शुल्क)
  • ✓कार्य समय में 1–2 घंटे में ईमेल डिलीवरी
अनुसंधान शुल्क:₹49एकमुश्त
योजना ब्लूप्रिंट प्राप्त करें (₹49)→

🔒 सुरक्षित रेज़रपे चेकआउट • 100% स्वतंत्र

⚡आवेदन प्रयास व प्रक्रिया मूल्यांकन (Effort Breakdown)

आधिकारिक आवश्यकताओं, अनिवार्य दस्तावेज़ों और आवेदन माध्यमों पर आधारित वस्तुनिष्ठ मूल्यांकन।

Moderate Process (3/10)
•100% डिजिटल ऑनलाइन आवेदन प्रक्रिया
•4 अनिवार्य सहायक दस्तावेज़ आवश्यक

प्रयास स्कोर पोर्टल पहुंच, अनिवार्य दस्तावेज़ों की संख्या और भौतिक सत्यापन आवश्यकताओं को दर्शाता है।

📝आवेदन कैसे करें (How to Apply)

🌐 ऑनलाइन पोर्टल माध्यम
  1. 1

    Check tender / expression of interest issued by State Renewable Energy Development Agency (SREDA).

  2. 2

    Register land parcel details on the state PM-KUSUM portal.

  3. 3

    Submit proof of land ownership within 5 km radius of 33/11 kV sub-station.

  4. 4

    Participate in tariff bidding or opt for developer lease model.

  5. 5

    Execute 25-year PPA with state electricity distribution company (DISCOM) and synchronize solar plant.

✅आवेदन से पहले — पूर्व-तैयारी सूची

✓आधार से सक्रिय मोबाइल नंबर लिंक है
✓बैंक खाता NPCI मैपर से आधार-सीडेड है (DBT के लिए)
✓जांचें कि आप पहले से कोई समान योजना का लाभ नहीं ले रहे
✓दस्तावेज़ तैयार रखें: आय/जाति/निवास प्रमाण पत्र

⚠️अस्वीकृति के सामान्य कारण — इनसे बचें

Land parcel located beyond 5 km of sub-station, inadequate transmission substation capacity, or disputed land title.

आधिकारिक सरकारी आवेदन पोर्टल

आपको सुरक्षित आधिकारिक पोर्टल पर पुनर्निर्देशित किया जाएगा: pmkusum.mnre.gov.in

आधिकारिक सरकारी वेबसाइट पर आवेदन करें
🔔निःशुल्क नागरिक सेवा•DPDP अधिनियम 2023 अनुपालन

अपने लिए अनुकूलित योजनाओं के अलर्ट और समय-सीमा प्राप्त करें

किस्त की तारीख, छात्रवृत्ति की अंतिम तिथि या नए राज्य अनुदान कभी न चूकें। व्हाट्सएप या ईमेल पर सीधे सत्यापित सरकारी अपडेट प्राप्त करने के लिए स्वेच्छा से सदस्यता लें।

+91
10-अंकीय भारतीय मोबाइल नंबर
🛡️
शून्य डेटा बिक्री गारंटी: Eligo आपके व्यक्तिगत संपर्क विवरण (नाम, मोबाइल, ईमेल) को किसी भी तीसरे पक्ष, ब्रोकर या विज्ञापनदाता को कभी नहीं बेचता है। डेटा केवल मुंबई (भारत) में सुरक्षित रखा जाता है।

🔒 शून्य स्पैम • डेटा केवल मुंबई (भारत) में सुरक्षित

❓अक्सर पूछे जाने वाले प्रश्न (Officially Sourced FAQs)

आधिकारिक परिपत्रों, गजट व पोर्टल से सीधे सत्यापित उत्तर।

How much land is required for a 1 MW solar plant?

Approximately 4 to 5 acres of unshaded land is needed to establish a 1 MW ground-mounted solar power plant.

स्रोत: आधिकारिक FAQ ↗

Can a farmer who does not have capital to invest still participate?

Yes, farmers can lease their uncultivated land to independent solar power developers and earn guaranteed annual lease rental without investing any capital.

स्रोत: आधिकारिक FAQ ↗

What is the tenure of the Power Purchase Agreement (PPA)?

The PPA signed with the state electricity distribution company is legally binding for a duration of 25 years.

स्रोत: आधिकारिक FAQ ↗

Who is eligible to apply for PM-KUSUM Component A (Grid-Connected Solar Power Plants)?

Eligible applicants must satisfy official government criteria for PM-KUSUM Component A (Grid-Connected Solar Power Plants). Age: min 18 years. Conditions: Individual farmers, groups of farmers, cooperatives, panchayats, or Water User Associations owning land within 5 km radius of a 33/11 kV grid sub-stat.

स्रोत: आधिकारिक FAQ ↗

क्या मैं अपने PM-KUSUM Component A (Grid-Connected Solar Power Plants) आवेदन की स्थिति ट्रैक कर सकता हूँ?

PM-KUSUM Component A (Grid-Connected Solar Power Plants) के आवेदन की स्थिति आमतौर पर आधिकारिक पोर्टल pmkusum.mnre.gov.in पर अपने आधार नंबर, आवेदन संदर्भ संख्या, या पंजीकृत मोबाइल नंबर का उपयोग करके ट्रैक की जा सकती है। वैकल्पिक रूप से, योजना हेल्पलाइन पर संपर्क करें या अपने नजदीकी कॉमन सर्विस सेंटर (CSC) पर जाएं।

यदि मेरा PM-KUSUM Component A (Grid-Connected Solar Power Plants) भुगतान विलंबित या अस्वीकृत हो जाए तो मुझे क्या करना चाहिए?

सबसे पहले, NPCI मैपर (npci.org.in) पर अपने आधार-बैंक खाता सीडिंग स्थिति की पुष्टि करें। यदि सीडिंग सक्रिय है और भुगतान फिर भी लंबित है, तो pgportal.gov.in पर केंद्रीय लोक शिकायत निवारण प्रणाली पर शिकायत दर्ज करें। आप अस्वीकृति का आधिकारिक कारण 30 दिनों के भीतर जानने के लिए rtionline.gov.in पर एक RTI आवेदन भी दायर कर सकते हैं।

क्या PM-KUSUM Component A (Grid-Connected Solar Power Plants) का लाभ प्राप्त करने पर आयकर (Income Tax) की देनदारी बनती है?

कृषि आय और कुछ विशिष्ट कल्याणकारी सब्सिडी को आयकर अधिनियम, 1961 की धारा 10 के तहत आयकर से छूट मिल सकती है। कर छूट योजना के प्रकार और लाभार्थी की समग्र आय पर निर्भर करती है। विस्तृत कर मार्गदर्शन के लिए प्रमाणित कर सलाहकार से परामर्श लें या incometax.gov.in देखें।

अस्वीकृति के सामान्य कारण एवं सावधानियां

Land parcel located beyond 5 km of sub-station, inadequate transmission substation capacity, or disputed land title.

संपादकीय सत्यापन एवं परिवर्तन लॉग

योजना सत्यापन एवं परिवर्तन इतिहास
तिथिफ़ील्डविवरणस्रोत
2026-10-18scheme_typecsआधिकारिक स्रोत ↗
2026-09-24initial_verificationBaseline verification of PM-KUSUM Component A (Grid-Connected Solar Power Plants) guidelines, benefits, and portal integration.आधिकारिक स्रोत ↗

⚖समान योजनाओं से तुलना करें

पात्रता, लाभ और आवेदन प्रयास की आमने-सामने तुलना:

आवेदन विंडो एवं अंतिम तिथि

State-wise tender notifications released by DISCOMs and nodal agencies

Scheme Intelligence

How is this calculated? ↗
Data ConfidenceFully Verified (100%)

Verified 7d ago from .gov.in source

Access FrictionModerate Process

Requires documentation or office visit

How to Apply🖥Apply Online
Scale & Impact
👥Commissioned over 1,200 MW solar capacity on farmer lands across India (as of 2026-01-31)
₹₹34,422 Crore central financial outlay for total PM-KUSUM scheme budget allocation
📅Running since 2019
🔄2 verified updates — actively maintained

संबंधित योजनाएं

Pradhan Mantri Kisan Samman Nidhi (PM-KISAN)

Direct income support of ₹6,000 per year in three equal installments to landholding farmer families across India provided through direct benefit transfer.

Pradhan Mantri Matsya Sampada Yojana (PMMSY)

National flagship scheme for fisheries development providing 40% to 60% capital subsidies for aquaculture, marine fishing boats, cold storage, and fish farming infrastructure.

Pradhan Mantri Fasal Bima Yojana (PMFBY)

Comprehensive agricultural crop insurance covering yield loss from pre-sowing to post-harvest perils at ultra-low farmer premiums of 1.5% to 2%.

📅योजना मील-पत्थर समयरेखा

2026-09-24initial_verification

Baseline verification of PM-KUSUM Component A (Grid-Connected Solar Power Plants...

आधिकारिक स्रोत ↗
⚡

साथ में मिलने वाली अन्य योजनाएँ (Stackable)

पूरक योजनाएँ जिन्हें आप इस योजना के साथ एक साथ प्राप्त कर सकते हैं:

Pradhan Mantri Awas Yojana - Urban (PMAY-U / Housing for All)₹2,50,000 (one-time)✓ Open to all genders · Overlapping profile match
Pradhan Mantri Awas Yojana - Gramin (PMAY-G)₹1,20,000 (one-time)✓ Open to all genders · Overlapping profile match
Ayushman Bharat - Pradhan Mantri Jan Arogya Yojana (AB-PMJAY)₹5,00,000 (annual)✓ Open to all genders · Overlapping profile match
Pradhan Mantri Ujjwala Yojana (PMUY / Ujjwala 2.0)₹1,600 (one-time)✓ Overlapping profile match

आधिकारिक हेल्पलाइन एवं नोडल कार्यालय

Grid Solar Division, Ministry of New and Renewable Energy

Atal Akshay Urja Bhawan, CGO Complex, Lodhi Road, New Delhi 110003

हेल्पलाइन: 011-24360707

कार्यक्षेत्र: National

कोई त्रुटि दिखी?

नागरिक डेटा को 100% सटीक रखने में मदद करें। हम प्रत्येक रिपोर्ट का सत्यापन आधिकारिक गजट से करते हैं।

सत्यापन विवरण

Eligo शोधकर्ताओं द्वारा आधिकारिक सरकारी दस्तावेजों के आधार पर अंतिम सत्यापन: 2026-10-12 (180-दिवसीय सत्यापन SLA)।

Eligo एक स्वतंत्र सूचना मंच है, किसी सरकारी निकाय से संबद्ध नहीं। नवीनतम शर्तों की पुष्टि हमेशा आधिकारिक पोर्टल पर करें।